6/4/2003
Timeline
updated
4/22/2003
Entrance page (Home) revised
2/25/2003
Photographs
added
1/28/2003
Timeline
updated
11/6/2002
Revision to Masterplan
added
5/14/2002
Fixed problems when viewed in Netscape 6+
Removed duplicate navigation on some pages
5/5/2002
Photographs open in seperate windows
Added new F&L Logo in Footer of all pages
Changed default 3D VR pages to smaller version
Moved Site into Public Area
1/23/2002
North Arrows added to plans
Key symbols updated
11/14/2001
Design Development Section Expanded with New Design Plans
Timeline updated
3D View Pages Set Up for VR
8/14/2001
Roster list updated
3D Perspective and Plan Views added
Schematic Design - Meeting 4 Plans updated
Timeline updated
8/14/2001
3d Images Updated
Meeting Minutes Updated
Meeting 4 - Scheme 9-2-A added
8/1/2001
Coyote Logo to Black
Photographs sub-section moved left.
New "Additions" changed to "New - Recent Changes to This Site"
Scheme 10 Section added
Contact person Bill Schmidt added.
"Zoom In" text added to button
Site Photographs reorganized
.
Clickable map added.
District logo and link added to lower right.
Consultant list adjusted
7/30/2001
Meeting Minutes
Plan Studies
Update of 3D graphics
Architectural floor plans.
Graphics and mascots added
Color studies of web page navigation and buttons
Site Photographs and Key Numbers
7/6/2001
Mock up of entire site
Rough 3D Graphics of existing buildings